Everything you need to know about obtaining a solar panel permit in Madison, WI. From costs and timelines to required documents and the step-by-step approval process.

$375
Estimated Permit Cost
3-5 weeks
Typical Timeline
Full
Net Metering Policy

Solar Permit Process in Madison

  1. 1

    Get Solar Quotes

    Contact licensed solar installers serving Madison. Your installer typically handles the entire permit process.

  2. 2

    System Design & Engineering

    Your installer creates a system design including roof layout, electrical diagrams, and structural analysis.

  3. 3

    Submit Permit Application

    File the application with Madison's building department. Cost: approximately $375.

  4. 4

    Permit Review & Approval

    The building department reviews your application. Typical timeline: 3-5 weeks.

  5. 5

    Installation

    Once the permit is approved, your installer schedules and completes the installation.

  6. 6

    Final Inspection

    Madison building inspector verifies the installation meets electrical and building codes.

  7. 7

    Utility Interconnection

    Apply to Madison Gas and Electric (MG&E) for interconnection. They install a bi-directional meter for net metering.

  8. 8

    Permission to Operate (PTO)

    Madison Gas and Electric (MG&E) grants PTO and your system goes live on the grid.

Typical Documents Required

  • Completed permit application form
  • Site plan / roof layout drawing
  • Electrical single-line diagram
  • Equipment specifications (panels, inverter)
  • Structural engineering letter (if required)
  • Proof of contractor license
  • HOA approval letter (if applicable)

Other Cities in Wisconsin

More Solar Resources for Madison

Ready to Go Solar in Madison, WI?

Need Help With Permits in Madison?

We handle the entire permitting process for your Madison solar installation. Get a free quote and skip the paperwork.

Get Your Free Quote