Solar Permits in Spokane, WA

Everything you need to know about obtaining a solar panel permit in Spokane, WA. From costs and timelines to required documents and the step-by-step approval process.

$325
Estimated Permit Cost
2-4 weeks
Typical Timeline
Full
Net Metering Policy

Solar Permit Process in Spokane

  1. 1

    Get Solar Quotes

    Contact licensed solar installers serving Spokane. Your installer typically handles the entire permit process.

  2. 2

    System Design & Engineering

    Your installer creates a system design including roof layout, electrical diagrams, and structural analysis.

  3. 3

    Submit Permit Application

    File the application with Spokane's building department. Cost: approximately $325.

  4. 4

    Permit Review & Approval

    The building department reviews your application. Typical timeline: 2-4 weeks.

  5. 5

    Installation

    Once the permit is approved, your installer schedules and completes the installation.

  6. 6

    Final Inspection

    Spokane building inspector verifies the installation meets electrical and building codes.

  7. 7

    Utility Interconnection

    Apply to Avista Utilities for interconnection. They install a bi-directional meter for net metering.

  8. 8

    Permission to Operate (PTO)

    Avista Utilities grants PTO and your system goes live on the grid.

Typical Documents Required

  • Completed permit application form
  • Site plan / roof layout drawing
  • Electrical single-line diagram
  • Equipment specifications (panels, inverter)
  • Structural engineering letter (if required)
  • Proof of contractor license
  • HOA approval letter (if applicable)

Other Cities in Washington

More Solar Resources for Spokane

Ready to Go Solar in Spokane, WA?

Need Help With Permits in Spokane?

We handle the entire permitting process for your Spokane solar installation. Get a free quote and skip the paperwork.

Get Your Free Quote