Solar Permit Process in Alexandria
- 1
Get Solar Quotes
Contact licensed solar installers serving Alexandria. Your installer typically handles the entire permit process.
- 2
System Design & Engineering
Your installer creates a system design including roof layout, electrical diagrams, and structural analysis.
- 3
Submit Permit Application
File the application with Alexandria's building department. Cost: approximately $375.
- 4
Permit Review & Approval
The building department reviews your application. Typical timeline: 3-5 weeks.
- 5
Installation
Once the permit is approved, your installer schedules and completes the installation.
- 6
Final Inspection
Alexandria building inspector verifies the installation meets electrical and building codes.
- 7
Utility Interconnection
Apply to Dominion Energy Virginia for interconnection. They install a bi-directional meter for net metering.
- 8
Permission to Operate (PTO)
Dominion Energy Virginia grants PTO and your system goes live on the grid.
Typical Documents Required
- ✓Completed permit application form
- ✓Site plan / roof layout drawing
- ✓Electrical single-line diagram
- ✓Equipment specifications (panels, inverter)
- ✓Structural engineering letter (if required)
- ✓Proof of contractor license
- ✓HOA approval letter (if applicable)
Other Cities in Virginia
More Solar Resources for Alexandria
Ready to Go Solar in Alexandria, VA?
Need Help With Permits in Alexandria?
We handle the entire permitting process for your Alexandria solar installation. Get a free quote and skip the paperwork.
Get Your Free Quote