Solar Permits in Chicago, IL

Everything you need to know about obtaining a solar panel permit in Chicago, IL. From costs and timelines to required documents and the step-by-step approval process.

$500
Estimated Permit Cost
4-8 weeks
Typical Timeline
Full
Net Metering Policy

Solar Permit Process in Chicago

  1. 1

    Get Solar Quotes

    Contact licensed solar installers serving Chicago. Your installer typically handles the entire permit process.

  2. 2

    System Design & Engineering

    Your installer creates a system design including roof layout, electrical diagrams, and structural analysis.

  3. 3

    Submit Permit Application

    File the application with Chicago's building department. Cost: approximately $500.

  4. 4

    Permit Review & Approval

    The building department reviews your application. Typical timeline: 4-8 weeks.

  5. 5

    Installation

    Once the permit is approved, your installer schedules and completes the installation.

  6. 6

    Final Inspection

    Chicago building inspector verifies the installation meets electrical and building codes.

  7. 7

    Utility Interconnection

    Apply to ComEd (Commonwealth Edison) for interconnection. They install a bi-directional meter for net metering.

  8. 8

    Permission to Operate (PTO)

    ComEd (Commonwealth Edison) grants PTO and your system goes live on the grid.

Typical Documents Required

  • Completed permit application form
  • Site plan / roof layout drawing
  • Electrical single-line diagram
  • Equipment specifications (panels, inverter)
  • Structural engineering letter (if required)
  • Proof of contractor license
  • HOA approval letter (if applicable)

Other Cities in Illinois

More Solar Resources for Chicago

Ready to Go Solar in Chicago, IL?

Need Help With Permits in Chicago?

We handle the entire permitting process for your Chicago solar installation. Get a free quote and skip the paperwork.

Get Your Free Quote