EV Solar Calculator for Lee's Summit, MO

Homeowners in Lee's Summit pay an average of $148/month for electricity through Evergy. With 4.5 peak sun hours per day, solar can power both your home and EV charging.

4.5h/day
Peak Sun Hours
14.2¢/kWh
Electricity Rate
$148
Avg Monthly Bill
Full
Net Metering

Calculate Your EV Solar Needs in Lee's Summit

Adjust Your Details for Lee's Summit, MO

5,00030,000
0 kW15 kW
$
$2.00$7.00
15 MPG50 MPG

Your EV Solar Charging Estimate

Daily kWh for EV
8.7 kWh
Additional Solar Needed
1.9 kW
Additional Panels
5 panels
Additional Cost (before ITC)
$5,479
Cost After 30% ITC
$3,836
Annual Gas Savings
$1,052
Payback Period
3.6 years
Combined System
1.9 kW (5 panels)

* Estimates based on 4.5 peak sun hours/day in Lee's Summit, MO, 14.2¢/kWh electricity rate, 12,000 annual miles, Tesla Model 3 at 3.8 mi/kWh, 30% federal ITC, and $3.50/gal gas at 28 MPG comparison. Actual results may vary.

Local Solar Details for Lee's Summit

Utility & Permits

Utility Company
Evergy
Permit Cost
$300
Permit Timeline
2-4 weeks
Net Metering
full

EV Charging at a Glance

Electricity Rate
14.2¢/kWh
Avg Sun Hours
4.5h/day
Avg Monthly Bill
$148/mo
System Cost
$2.75/watt

Other Cities in Missouri

More Solar Tools for Lee's Summit

Ready to Go Solar in Lee's Summit, MO?

Charge Your EV With Solar in Lee's Summit

Get a free personalized quote for your Lee's Summit home. We design systems that cover both home energy and EV charging.

Get Your Free Quote