EV Solar Calculator for Silver Spring, MD
Homeowners in Silver Spring pay an average of $162/month for electricity through Pepco. With 4.4 peak sun hours per day, solar can power both your home and EV charging.
4.4h/day
Peak Sun Hours
17¢/kWh
Electricity Rate
$162
Avg Monthly Bill
Full
Net Metering
Calculate Your EV Solar Needs in Silver Spring
Adjust Your Details for Silver Spring, MD
5,00030,000
0 kW15 kW
$
$2.00$7.00
15 MPG50 MPG
Your EV Solar Charging Estimate
Daily kWh for EV
8.7 kWh
Additional Solar Needed
2 kW
Additional Panels
5 panels
Additional Cost (before ITC)
$5,604
Cost After 30% ITC
$3,923
Annual Gas Savings
$963
Payback Period
4.1 years
Combined System
2 kW (5 panels)
* Estimates based on 4.4 peak sun hours/day in Silver Spring, MD, 17¢/kWh electricity rate, 12,000 annual miles, Tesla Model 3 at 3.8 mi/kWh, 30% federal ITC, and $3.50/gal gas at 28 MPG comparison. Actual results may vary.
Local Solar Details for Silver Spring
Utility & Permits
- Utility Company
- Pepco
- Permit Cost
- $375
- Permit Timeline
- 3-5 weeks
- Net Metering
- full
EV Charging at a Glance
- Electricity Rate
- 17¢/kWh
- Avg Sun Hours
- 4.4h/day
- Avg Monthly Bill
- $162/mo
- System Cost
- $2.85/watt
Other Cities in Maryland
More Solar Tools for Silver Spring
Ready to Go Solar in Silver Spring, MD?
Charge Your EV With Solar in Silver Spring
Get a free personalized quote for your Silver Spring home. We design systems that cover both home energy and EV charging.
Get Your Free Quote