EV Solar Calculator for Carmel, IN

Homeowners in Carmel pay an average of $160/month for electricity through Duke Energy Indiana. With 4.2 peak sun hours per day, solar can power both your home and EV charging.

4.2h/day
Peak Sun Hours
15.5¢/kWh
Electricity Rate
$160
Avg Monthly Bill
Full
Net Metering

Calculate Your EV Solar Needs in Carmel

Adjust Your Details for Carmel, IN

5,00030,000
0 kW15 kW
$
$2.00$7.00
15 MPG50 MPG

Your EV Solar Charging Estimate

Daily kWh for EV
8.7 kWh
Additional Solar Needed
2.1 kW
Additional Panels
6 panels
Additional Cost (before ITC)
$5,871
Cost After 30% ITC
$4,110
Annual Gas Savings
$1,011
Payback Period
4.1 years
Combined System
2.1 kW (6 panels)

* Estimates based on 4.2 peak sun hours/day in Carmel, IN, 15.5¢/kWh electricity rate, 12,000 annual miles, Tesla Model 3 at 3.8 mi/kWh, 30% federal ITC, and $3.50/gal gas at 28 MPG comparison. Actual results may vary.

Local Solar Details for Carmel

Utility & Permits

Utility Company
Duke Energy Indiana
Permit Cost
$350
Permit Timeline
2-4 weeks
Net Metering
full

EV Charging at a Glance

Electricity Rate
15.5¢/kWh
Avg Sun Hours
4.2h/day
Avg Monthly Bill
$160/mo
System Cost
$2.8/watt

Other Cities in Indiana

More Solar Tools for Carmel

Ready to Go Solar in Carmel, IN?

Charge Your EV With Solar in Carmel

Get a free personalized quote for your Carmel home. We design systems that cover both home energy and EV charging.

Get Your Free Quote