EV Solar Calculator for Gilbert, AZ
Homeowners in Gilbert pay an average of $172/month for electricity through Salt River Project. With 6.5 peak sun hours per day, solar can power both your home and EV charging.
6.5h/day
Peak Sun Hours
14¢/kWh
Electricity Rate
$172
Avg Monthly Bill
Partial
Net Metering
Calculate Your EV Solar Needs in Gilbert
Adjust Your Details for Gilbert, AZ
5,00030,000
0 kW15 kW
$
$2.00$7.00
15 MPG50 MPG
Your EV Solar Charging Estimate
Daily kWh for EV
8.7 kWh
Additional Solar Needed
1.3 kW
Additional Panels
4 panels
Additional Cost (before ITC)
$3,793
Cost After 30% ITC
$2,655
Annual Gas Savings
$1,058
Payback Period
2.5 years
Combined System
1.3 kW (4 panels)
* Estimates based on 6.5 peak sun hours/day in Gilbert, AZ, 14¢/kWh electricity rate, 12,000 annual miles, Tesla Model 3 at 3.8 mi/kWh, 30% federal ITC, and $3.50/gal gas at 28 MPG comparison. Actual results may vary.
Local Solar Details for Gilbert
Utility & Permits
- Utility Company
- Salt River Project
- Permit Cost
- $300
- Permit Timeline
- 2-3 weeks
- Net Metering
- partial
EV Charging at a Glance
- Electricity Rate
- 14¢/kWh
- Avg Sun Hours
- 6.5h/day
- Avg Monthly Bill
- $172/mo
- System Cost
- $2.6/watt
Other Cities in Arizona
More Solar Tools for Gilbert
Ready to Go Solar in Gilbert, AZ?
Charge Your EV With Solar in Gilbert
Get a free personalized quote for your Gilbert home. We design systems that cover both home energy and EV charging.
Get Your Free Quote